Air Blaster System Installations in Cement Plant
 |
 |
 |
|
Air Canons installed for removing coating in
Cyclone-Riser Duct Bend. |
Air Cannons installed for removing coating in
Grate Cooler. |
Air Blasters installed for removing
coating in Pre-Heater Inlet Chamber (Duct). |
OTHER AREAS OF CEMENT PLANT FOR AIR BLASTER (Airchoc) SYSTEM
INSTALLATION
- Feed Pipe, Smoke Chamber, Gypsum Hopper, Lime Stone Hopper,
Pre-Heater Fan, Riser Duct, Cyclone, Coller, Burner pipe, Chutes and
Cement Silo.
- AIR BLASTERS (Airchocs) ARE ALSO USED IN VERY LARGE NUMBER IN
FOLLOWING PLANTS AND INDUSTRIES.
- Thermal Power Plant : Raw Coal Bunker, Coal Handling
Plant (CHP) Coal Chutes.
- Steel Plants : Sintering Plant (Hoppers), Coke Oven
Plant, Refractory Plant, Raw Material Handling Plant etc.
- Mines : Coal, Lignite and Iron Ore etc.
- Coal Washery
- Paper Industry
- Sugar Industry
- Chemical Plants
- Fertilizer Plants
- Co-generation from D.G. Sets (for removal of soot for heat
recovery) Earlier Steam Blowers were used which were expensive
as well as cumbersome.
- Food & Pharmaceutical Industries.
- Concrete Readymix.
- MM Air Blaster operates without interrupting the plant operation
thus avoiding production loss.
- Air Blaster operation will not affect the structure and surface.
- Air Blaster ensures increase in production by optimum capacity
utilization of hopper/bunker. Further, it also reduces the running
and maintenance cost of material handling system (conveyer belts)
and also saves power.
- Air Blaster can be serviced without dismantling the Blaster.
- Air Blaster works on plant air and no specific quality of
instrument air is required. However, in case where plant air is not
available at site, a portable compressor is sufficient.
- Spring loaded piston design helps in mounting the blaster in any
position.
|